INDUSTRY NEWS

Pre-assembled solar bridges energy gaps and challenges large-scale traditions

2024-06-27

Scatec’s solar-plus-storage system using prefabricated solar tracker structures from Cambridge Energy. Image: Scatec.

Cost and risk factors can make countries facing energy access issues the most difficult for developers to build solar projects, despite their huge potential. Tom Kenning reports on two plug-and-play solutions that may provide a solution in off-grid locations.


Most PV system contracts involve solar systems being in one location for 25 years, but a new model of leasing re-deployable solar PV systems could offer flexibility to off-grid applications where power is only needed for a few years, while countries with electricity access problems could use these systems to bridge emergency energy gaps.

 

(The above content is reproduced from pv-tech,By Tom Kenning)

 

Disclaimer: This website reproduces information from cooperative media, institutions or other websites. The publication of this article for the purpose of transmitting more information,and it does not imply endorsement of its views or confirmation of the authenticity of the content.  All information on this website is for reference only and can’t be used as the basis for transactions or services. If there are any infringement or other issues in the content of this website, please notify it in time, then this website will be promptly modified or deleted. Anyone who logs in to this website in any way, or directly or indirectly uses the information on this website shall be deemed to have voluntarily accepted the binding of this website statement.